Skip to content

Cement Mortar Lined and Coated (CMLC) Pipe Replacement

Replace over 2000 LF of old 6”-12” CMLC water piping with either HDPE or ductile iron pipe below grade or steel pipe above grade in hilly terrain.

The work consisted of demolition, replacing pipe, excavation and replacement, soil management and compaction, traffic planning, shoring, commissioning assistance.

Client

Department of Energy

Architect

GHD

Location

Lawrence Berkeley National Laboratory

Value

$1MM